Winter home decoration detailed solution

Renovation in winter

The bleakness and loneliness in winter have affected the passion of people's decoration more or less. In the traditional concept, most people prefer to follow the old notion of “won't use the earth in winter”, and the cold and dry climate and the decoration of the New Year cause the winter decoration to become “inconvenient”.

In fact, in the final analysis, the crux of winter decoration is on temperature and humidity. From a dialectical point of view, whether or not the winter decoration is really worrying is actually subject to research. The temperature is indeed low, but the heating provides temperature protection; low humidity does tend to shrink the wood, but the paint will dry faster. If the pros and cons of each one can be well managed, the season will not be an obstacle to resist our passion for decoration.

This issue of the series is a memorandum of understanding for owners who want to start construction in the winter. This includes the preparations to be made before the renovation, the issues to be considered and concerned when each room is renovated in the winter, and so on. From the advantages and disadvantages of the winter decoration, to the details of the various decoration, each will be in trouble in the winter decoration we will provide detailed solutions.

However, if you don’t have a renovation plan yet, how to make “home” safe for the winter is also worthy of concern. Well-made furniture and decoration may also cause problems in the dryness and cold of winter. Therefore, we will introduce some simple and easy methods to teach you how to protect and maintain them and make your "home" safe for the winter.

For winter decoration, we must clarify where its disadvantages are, and try to find ways to overcome these disadvantages. At the same time, it must also excavate its advantages and change its disturbing impression. The kitchen and bathroom are the most technologically advanced projects in the pre-decoration period, including hydropower reform, concealment projects, etc.; and the living room, dining room and bedroom are more focused on the construction of walls, floors and ceilings, and each has different attention. matter.

<<< link: rainy season can also be decorated with disadvantages helpful and reasonable

Advantages and disadvantages of winter decoration

Cold and dry make most people think that winter decoration must have a lot of disadvantages, but in fact the winter decoration also has other advantages unparalleled in other seasons. First we will do an objective analysis.

Advantage:

1. The quality of wooden decoration is guaranteed. The temperature difference between indoor and outdoor in winter is large, and the cracking or deformation of wood is usually seen in a short time (one or two months). At this time, the paint has not been painted and can be modified or dismantled immediately.

2. Paint spray effect is good. Indoor drying in winter, paint spray effect is good. The quick drying of the paint reduces the adsorption of dust particles in the air, and the effect of brushing out color and quality is excellent.

3. The heating effect can be changed. In winter, you can directly experience heating. The room temperature is not ideal and you can adjust it at any time. You can use other methods, but you can also change the decoration or heating at any time.

4. Discount promotions at the end of the year. All major businesses have actively launched various promotions that meet the needs of the old and new at the end of the year. Especially under the premise that the economic situation is not very good this year, manufacturers have all made every effort to provide customers with various special bargaining activities.

Disadvantages:

1. The weather is cold and the materials are inconvenient.

2. Due to workers' Spring Festival holidays, the entire construction period will be delayed.

3. Concerns that the process of drying the cement due to the low temperature during the solidification will be powdered, making it not sticky. It will not happen under the premise of ensuring the room temperature.

In fact, during the winter decoration process, as long as it pays a little attention, it will be able to reduce costs.

<<

Winter search full search

Control room temperature

In the winter in the north, when the cold air comes, the temperature will drop sharply. This sudden drop in temperature will be a fatal blow to the decoration. Low temperatures, especially with high winds, can have several effects on building materials: First, shrinkage and second, evaporation of water. Taking wall paint and wood ware as an example, a sudden drop in temperature will cause sharp contractions in the interface between the paint and wood, leading to various cracking phenomena.

In winter construction, it is necessary to control the room temperature. When the cold air comes, it is necessary to close the window in time. When the room temperature is close to the outdoor temperature, the window should be properly ventilated.

Resting the main material

The main materials used in the decoration, especially the wood, should be prepared in advance. It is best to place it in a room with heating equipment for 3 to 5 days to evaporate the moisture produced by the temperature change so as to avoid deformation after renovation.

The sand should be carefully sieved and there should be no ice cubes. Some anti-freeze agents can be properly added according to actual construction requirements. Cement can't be applied in open air, and it must be protected against freezing. Wall tiles and floor tiles must be paved when they are adapted to the room temperature.

Early wood seal paint

In winter decoration, take care not to stack the decoration materials on the heating equipment so as to avoid deformation caused by uneven heating. For some wood, sealer treatment should be done sooner. The sealer can prevent dirt and reduce water loss.

control time

The decoration should be completed before the Spring Festival, and the time should be sufficient. This can ensure that the construction staff will not be able to complete the decoration and go through the New Year to complete the New Year. If the decoration is halfway down due to the New Year's return home, it will also be suspended. It will add to your troubles such as fire prevention and security.

Pot water

After the renovation is completed, you can put a pot of clear water in each room to increase the indoor humidity, which can delay the time of the wall surface, top surface, and furniture cracks.

Leave expansion joints

In winter construction, the problem of joints must also be controlled. In the winter decoration, due to the sheet being in a contracted state, if the installation is too dense, the sheet will expand when the temperature rises in the summer, and if the joints are too small, it will easily cause deformation. The door seam should not be too small, so as to avoid the summer door tight, can not be switched freely; when laying solid wood flooring, around 2 mm of expansion joints should be left around, otherwise it will cause a drum, dangling phenomenon; when making furniture, need to set aside 0.1 mm The seams on the left and right sides of the joint avoid deformation; the seams of all wood products are controlled at about 1 mm, and the joints of plasterboard and cement board are controlled at about 8 mm.

Pay attention to fire

Winter is too dry, decoration should pay attention to fire prevention. Indoor decoration waste, such as wood chips and other flammable materials should be timely cleaned, paint and other items should be placed on the balcony and other ventilation places.

Air detection

Heating season decoration, air drying, poor indoor ventilation, decoration materials, formaldehyde, benzene and other harmful substances volatile, the concentration can easily exceed the standard. Before you check in, you should do an air test to be sure.

Carefully change the window

To replace ordinary steel windows or aluminum alloy windows with plastic steel windows, it is also necessary to pay attention to some issues: 1. Replace the outer window to be fixed; 2. Seal the cement mortar around the outer window; be sure to block tightly; 3. Seal the plastic window Do not seal too tightly. The window will shrink to a certain extent during the installation in autumn and winter, and it will swell when it is heated in the hot summer.

Noon acceptance

During the winter renovation to acceptance, we will encounter a real problem, that is, the interior begins to be dim, and indoor natural lighting will become very poor in the evening near the evening. It is best to place the acceptance on the noon where natural light is most abundant. For example, if the brick wall used in the kitchen is ordinary brick and waist line or tile, under natural light, we can see that its construction quality is very good, but under non-natural light, due to different wall tiles With regard to the problem of reflection, good construction quality may be viewed by the inspector as a quality problem.

Use less warm colors

In winter decoration, many people will unconsciously choose warm colors, especially in the home decoration configuration. However, if there is too much warmth, it will feel too hot in the spring or summer.

Moderate ventilation

The role of window ventilation is mainly to allow the air to circulate, to take away harmful gases such as formaldehyde, ammonia and benzene that are emitted from the decoration materials, and also to make the wall paint quickly dry. However, the outdoor cold air can easily deteriorate the paint, and it is easy to freeze the paint without drying. Therefore, to moderately open the windows, it is best to open the windows for ventilation before and after noon.

Oilwork insulation

Putty cannot be too thick. Because the indoor air is dry, the water loss is faster, otherwise it is easy to cause emptying, cracking, and wall inequality. When the oiler sprays a variety of paints, he should apply the paint in strict accordance with the temperature in the product description. The ambient temperature applied by the paint should not be lower than 5°C. The ambient temperature when the varnish is applied should not be lower than 8°C. Pay attention to “warmth”, fully dry and open the doors and windows for ventilation.

Raise flowers

Due to poor ventilation in the winter renovation, the interior will have more or less harmful gas. For newly renovated houses, you do not need to rush to check in, and you must extend the check-in time. It is best to raise some flowers and let the harmful gases be absorbed and then stay.

Winter home improvement tips

Common disease 1: The weather in winter is relatively cold. There is moisture or condensation on the wall or surface. When the temperature rises, small bubbles will form and crack.

Solution: During winter construction, heating needs to be turned on to speed up the drying of the wall. If you choose the traditional wall paint, be sure to place the wall paint in the room for more than 12 hours. When the temperature is almost the same as the interior and then brushing, if the rough room, putty do not apply too thick, easily lead to cracking. If you choose a wallpaper, its adhesive should not be applied directly from the outside, but it should be placed indoors for a while.

Common disease 2: In the winter, the painted wall has not dried yet, and the wall paint freezes, causing the color to be not bright, which affects the future appearance of the room.

Solution: If you choose a wall paint, you must choose a big brand. Before painting, paint the interior for a while. This will not only accelerate the drying of the paint, but also reduce the adsorption of dust particles in the air. , brush out of paint better. After the completion of the construction, attention should be paid to ventilation. It should be selected in the warm afternoon, and ventilation time should not be too long. If a wall base fabric is selected, it can be completely naked in the winter and not painted with any wall paint. It can be applied to a variety of wall paints by applying a variety of wall paints to the surface with its concave and convex textures to achieve the diversity of colors.

Common disease 3: tiles laid in winter, after a period of use, it is particularly prone to hollowing and shedding.

Solution: Before construction, the tiles must be soaked in water to make the water saturated. Because there is a large temperature difference between indoor and outdoor in winter, whether it is a wall tile or a floor tile, be sure to wait until it is suitable for indoor temperature. In addition, it should be timely after the paving, avoid bonding, cement adhesion due to the suction water is not strong. Finally, we must pay attention to the relative circulation of air, especially in special spaces such as kitchens and bathrooms.

Winter decoration mastered three degrees

I made tips for owners of winter renovations in three details to avoid unnecessary trouble.

1. Humidity

In the winter, the air is relatively dry, and the moisture content of the wood is low. Therefore, after the timber is shipped home, it is best to put some water in the living room and put the wood first for a week or two, so that the moisture content can be restored to normal saturation before use. . In this way, it is possible to avoid the appearance of cracks after painting or the appearance of warping or distortion after furniture is made. In addition, ventilation should be maintained in the living room to ensure air circulation and to prevent the growth of bacteria.

2. Scale

When paving the floor, try to leave the expansion joints in the wood. This scale is about 2 to 3 cm in summer and 3 to 4 cm in winter. This is to avoid the phenomenon of drum deformation at the floor seams after the weather has warmed up.

3. Progress

When the owner arranges the construction period, he or she should try not to cross the New Year. After the Spring Festival workers return home, it is easy to delay the construction period. In addition, the suspension of the project for too long may cause many unpredictable problems. Secondly, on the issue of accounting, we should try not to cross the New Year. For example, if we paid the money before, we would have to wait until after the year to deliver it. This would easily lead to unnecessary disputes.

Construction Acceptance Paint Interior Decorating Window Cement Furniture Decoration Living Room Floor Tiles Kitchen Wall Tiles Bathroom Tiles Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Ceilings Bathroom Tiles Restaurant Furniture Tile Glue Restaurant Ceiling Kitchen Tile Balcony Tile Small Bedroom Floor Tiles

Steel Hollow Section

Heavy Steel Pipe Co., Ltd , http://www.hzsteelpipe.com

Posted on