XBD-L single-stage vertical fire pump installation requirements are there?

The correct installation of fire pumps, a direct impact on the normal use of fire pumps and fire safety efficiency. Now Xiaobian to introduce XBD-L single-stage vertical fire pump installation requirements. XBD-L single-stage vertical fire pump XBD-L single-stage vertical fire pump installation requirements: 1. Check the water pump intact before installation. 2. Fire pump installation location should be as close to the water source. 3. There are two ways to install fire pump and base, one is rigid connection directly installed on cement foundation and the other one is flexible connection with JGD shock absorber. 4. Direct installation of the pump can be placed on the basis of padding 30 to 40 mm (prepared for filling with grout), and then calibrated and put on anchor bolts, filling cement mortar, after 3 to 5 days of cement dry up, Correct, until the cement is completely dry, tighten the anchor bolt. 5. Install the pipeline, the inlet and outlet pipes should have their own support, should not make the pump flange to withstand excessive pipeline weight. 6. Pump for suction occasion, the inlet pipe should be equipped with the end of the valve, and the import and export pipelines should not have too many corners, while no leakage, leakage phenomenon exists. 7. In the inlet pipe is best equipped with filters to prevent impurities from entering the impeller. The effective area of ​​the filter should be 3 ~ 4 times the area of ​​the inlet pipe to ensure the free flow of liquid. 8. In order to maintain and use convenient and safe, a regulating valve is installed on the inlet and outlet of the pump, and a pressure gauge is installed near the outlet of the pump to ensure the operation within the rated range to ensure the normal operation and service life of the pump. 9. If you need to expand the diameter of imports, please use eccentric reducer pipe joints. Further Reading: pump valve pipe fittings Exhibition 2016 Exhibition of Information Industry, Internet (Xiamen) Technology Co., Ltd. Author: Asian pumps Network Editor: Yao Xiaoxia (QQ / micro letter: 2355962924) http://beng.liuti.cn/ (Hotline : 400-6030-811)

Posted on