How to prepare the brick wall on the floor to recommend the method

Tiles are the most familiar building materials in our home decoration. They are also practical and beautiful. In the construction process, the tiles on the wall are not new. What needs to be prepared for the wall on the brick wall and how to carry out construction? Today Xiao Bian gave you the following introduction: The relevant content of the wall on the floor tiles , together to learn to understand it!

First, the brick wall preparation

1. From the tiles purchased on the market, you need to check whether there is powder on the back of the bricks. If yes, you need to clean them before laying. Although tiles are not easy to absorb water, they need to be placed in clean water and soaked for two hours.

2. The base of the paved area shall be kept flat and dry with no cracks on the surface of the wall. The wall surface shall not be excessively constructed. It is best to use a cement wall with strong adhesion. If it is the other wall surface, it must be removed before construction.

3, before laying, if the wall is uneven, need to use grinding machine or sandpaper polished smooth, to improve the wall paste. After construction, vacuum cleaners can be used to clean the dust until the walls are free of fine particles.

4. If the wall is painted with interior wall paint, the paint itself is relatively soft. If the paint is applied directly above, the tiles may fall. There is no need for much construction, and only a wall lining on the wall can solve this problem. At the same time, the yin and yang angles of the walls to be laid are horizontal and vertical. If they are not reached, construction problems may be caused. Therefore, before laying, you must use a triangular strip to correct the non-vertical female angle. After the tiles are laid on the wall, the sun corner is recommended to be secured with a bumper guard.

Second, the best method of brick wall

1, dry shop: need to first grind the recessed groove on the back of the tile, bury the copper wire, use the special glue for fixing the tile, and then use the same glue to fix the wall with the keel, generally suitable for the decoration of the background wall Wall surface. If it is a background wall, a keel is laid in place and a material of 12% is laid. Then, a groove is made on the back of the floor tile to hang a metal wire; the floor tile is fixed, and a screw is used to fix the floor, and then the copper wire is fixed together. Finally, the back surface of the floor tile is evenly coated with glue. Paving.

2. Wet shop: The paving method is the same as above, but the way of wet paving of the floor tiles is to use mortar and sand to make the mortar. Spread the floor tiles evenly and put them on the wall. However, before the construction, it is necessary to first grind the wall and roughen the process to increase the adhesion of the tiles.

Xiao Bian concludes: With regard to the preparation and methods of the walls on the floor tiles , I will briefly introduce them here and I hope to help you. For more information on the brick wall , please pay attention to this site, or you can visit this site offline direct experience!

Tiles Tiles Floor Tiles Floor Tiles Floor Tiles Best Ways

Carbon Steel Coil

Carbon Hot Steel Coil,Steel Carbon Coil Black Steel,Hot Rolled Carbon Steel Coil,Carbon Mild Coil Steel

Zhonglian Yongsheng Special Steel Co.,Ltd , https://www.zlysssteel.com

Posted on