Silent diesel generator check before operation

Silent diesel generator running check before clicking into the booth

First, the appearance of inspection: whether the engine outside the loss, missing parts, screws are loose, the generator output line or control line is damaged loose.

Second, the fuel system:

1. Is the fuel quantity sufficient, is there any leakage in the wiring piping, loose fittings (etc.), and the air in the fuel system is excluded.

2. Lubrication system: Is engine oil sufficient?

After overhauling an engine that has been reinstalled for 50 hours, the following maintenance must be performed:

A, engine oil replacement.

B, engine oil filter replacement.

C. Engine diesel filter replacement.

D, check valve valve clearance adjustment.

E. Inspection of external engine screws.

Third, the cooling system: cooling the radiator is enough water? Add rust inhibitor.

Fourth, the battery: The battery electrolyte is in normal liquid? Is the voltage correct and is the connector loose?

5. Is the charger operating normally?

6. Exhaust system: whether it is damaged or not, and whether the exhaust pipe is firmly installed.

7. Inflammable materials and sundries must not be stored around the unit.

Eight, whether the ventilation of the generator room is good.

Nine, casual people, etc. do not enter the room