Installation considerations for integrated ceilings

Integrated ceiling installation steps

1. Accurately measure the installation area and prepare for installation. 2. Install the edge line.

3, hit the expansion screw, suspend the boom.

4. Install the hook and install the light steel keel on the ceiling.

5. Fix the triangular keel of the hanging piece to the vertical direction of the light steel keel below the light steel keel.

6. Press the gusset into the triangle keel and make sure they are perpendicular to each other.

7. Install electrical appliances.

8, check adjustment

Integrated ceiling installation detailed steps

The correct installation of the integrated ceiling is directly related to the service life of the integrated ceiling and the safety of the integrated ceiling. Below, the integrated ceiling installation engineer of the top ten brands of the integrated ceiling teaches you how to install the integrated ceiling:

Preparation before installation:

Before installation, first ensure that there is no water leakage in the space where the kitchen cabinet needs to be installed, no cracks, and ensure that the corresponding facilities such as the water circuit have been laid. Then check whether the mounting surface has sufficient strength. If it does not meet the requirements, it should take reinforcement measures; calculate the height of the space left in the room after installing the ceiling according to the height required for the pre-installed electrical appliances, so as to facilitate the corner line. installation.

In order to meet the various requirements during the installation process, we also need to prepare the tools before installation: tape measure (measuring length and height), transparent water pipe (level measurement of wall), ink fountain (wall elastic), equilateral right angle Triangle ruler (measured by bevel cutting), scissors (fine trimming of materials), cutting machine (cutting keel, edge strip), sander (finishing of material burrs), electric hammer (wall punching), pistol Drilling (punching of materials such as keel), diamond bit (punching of tile wall), steel (finishing edge of edged strip), wooden hammer (flat gusset), hammer (knocking nail), 10 Inch \8 inch wrench (tightening nut), steel pliers (clamp material), twist drill (material punching), impact drill (wall punching), word / Phillips screwdriver (tightening screw), terminal block ( Connect the power supply), test pencil (tested with or without electricity), saw bow, saw blade (finely trimmed cutting material), wallpaper knife (fine trimming)...

The installation of the corner line will determine the installation height and level of the ceiling

In the case where the tile is attached to the top, on one side of the wall, take a point 230-240 cm above the ground, fix the coincidence point on the other side of the wall with a transparent water pipe, and then bounce the wire, and determine the punching position and drill with the diamond bit.

If the height of the ceiling can be determined by the height of the tile, the length of the wall is 3cm thick* the length of the wall can be fixed with steel nails on the wall above the tile, and the ink is ejected on the wooden strip according to the determined installation height. Install the edge strips horizontally.

The edge strips are taken according to the actual length, and the two ends are taken with an equilateral right angle triangle ruler to take a 45° angle and then saw 45° with a hacksaw blade (note: because the corners are not necessarily all 90°, they should be intercepted according to the actual angle), and the interception will be intercepted. The finished edge strips are honed with steel to remove the burrs. When the edge strips are fixed to the wall, the spacing of the screws should be 30-40 cm. The corners must be aligned without gaps.

Six screws will take up the weight of the entire integrated ceiling

First, measure the size on the ceiling, drill the screw into the expansion tube screw, and ensure that the height of the sandwich between the ceiling and the roof is not less than 25cm (Note: the connection between the screw and the ceiling is the reference for the installation of the entire ceiling, the screw must be perpendicular to the The ceiling is fixed and the screws must be kept parallel. In general, the top requires only six screws to make the entire ceiling strong.)

Next, take six points on the ceiling and then punch with a hammer without affecting the electrical installation.

Then measure the distance from the top to the corner line, cut the screw 8-10cm shorter than the actual distance, screw a nut on one side and screw the expansion screw. The screw is about 3 mm beyond the expansion screw. Screw the nut on the other side of the screw, put on the main keel hanger, and then screw a nut to fix the main keel hanger, then tap the expansion screw and the screw connection into the hole. Finally, the large ceiling is connected with a screw with a diameter of 6 mm. We first screw the nut into the screw, then insert the large hanger, then screw it into the nut, and so on.

The keel is the basis for the installation of the gusset and electrical appliances.

The first is the connection between the main keel and the large hanging piece. The main keel is stuck on each big hanging piece, and the main keel is selected according to the size of the space. After the main keel is inserted, it should be checked whether the main keel installed is parallel. If it is not parallel, it should be adjusted in time.

Secondly, the connection between the triangular keel and the main keel is carried out according to the number of the main keel. The triangular hanging piece is placed into the triangular keel, and the triangular hanging piece is fixed on the main keel in turn, and the distance between the triangular keels is adjusted to 300 mm and fixed. .

The connection method between the triangular keel and the main keel is: the required triangular keel is cut according to the actual installation length minus 5 mm. Insert the triangular hanger into the triangular keel and then snap the triangular hanger onto the main keel. The hanging piece of the triangular keel on the main keel of the same root should be opposite, so that the triangular keel does not swing back and forth when the gusset is easily installed.

After the main keel is connected with the triangular keel, the distance between the triangular keels is adjusted to 30cm, in order to facilitate the installation of the gusset and the electrical appliance. At the same time, pay attention to adjusting the horizontal plane of the keel. If the kitchen needs to install a range hood, the air outlet duct can be arranged in front of the gusset.

Finally, the connection between the triangular keel and the triangular keel

Insert the connector into the fixed triangular keel first, then cut the other end of the connector into the desired length. In this step, it should be noted that when connecting the triangular keel with the connecting piece, it is necessary to insert the connection, otherwise it will cause the falling to cause unevenness.

The installation of the first row of gussets is particularly important

After the keel is built and the hood is reserved, the gusset can be installed:

First, the film on the four sides of the gusset is picked up, but it is not necessary to completely tear it off, so that it is easy to install in the same direction according to the arrow on the film. Wear white gloves when installing the gusset. Before the installation of the first row of gussets, consideration should be given to cutting. When considering the overall aesthetics and the symmetry of the two sides, the side of the wall is cut with a utility knife. Because of the flatness of the wall, the surrounding gusset is required. It should be 1mm smaller than the actual size. Cutting method: use a utility knife and a ruler to describe more than 5 times, and the 18mm high folding edge is cut with a scissors to cut the 90° angle, and it can be folded 3-5 times by hand. The card is placed in the triangular keel, and the incision is placed on the edge strip and the card corner of the edge strip is pulled to clamp the buckle. The first row of gusset mounting is done by analogy. Be sure to control the gap between the first row of gussets, as the subsequent gusset installation depends on the first row of installation.

When installing the gusset, the spacing between the gussets should be 0. The four corners of the gusset should be in the shape of a “ten” and the height of the gusset should be consistent.

The electrical appliance is heavier than the gusset, so it needs to be fixed by the screw

Be sure to leave the required height of the appliance before installing the appliance.

According to the design drawings, confirm the accurate installation position of the mainframe, and then start to install the electrical equipment.

First, insert one side of the circlip into the circular hole on the rectangular hole circlip of the box, align it with the round hole on the electrical box, and insert and lock it with the 3*6 screw. Next, the box with the circlip is placed on the keel, and the open slots of the four circlips are pressed in sequence with the triangular keel, so that the electrical box is firmly locked on the triangular keel.

Then there is the connection of the power cord. Each host has a corresponding junction box, open the junction box, according to the corresponding function, connect according to the wiring label, L is the function line, N is the zero line, the double color line is the ground line, the switch is installed, the power supply test is performed, and the requirements are met. Cover the junction box.

Check if the gusset plate is installed flat and the appliance can be used normally.

After the above five steps are completed, the installation of the integrated ceiling is basically completed. Finally, in order to ensure the safety and functionality of the integrated ceiling that has just been installed, the next step is to install the self-test.

First of all, we have to check whether the viewing level of the corner installation is good, and we have to make a 90 degree angle without gaps and no obvious distortion. Then observe the overall flatness of the gusset and the gap between the gussets is good.

The next check is the strength of the screw. We can take a few gussets and check if the distance between the screws meets the installation standard. Then pull the screw with a suitable tension to confirm if there is any looseness.

Then check the number of electrical installations is firm. We can try to push the electrical body with the normal force by hand to see if the electrical appliance will fall off the triangular keel.

The last thing to test is whether the electrical function is functioning properly. We can open the switch to observe whether the electrical appliance is working normally; if the ventilation is used, the position of the heating module is reasonable; when the ventilation or air-heating module is turned on, the sound is normal, and there is no obvious noise.

Installation of integrated ceiling considerations

Determine whether to integrate the ceiling and the form of the integrated ceiling based on the height of the floor

The height of the home is very critical. If the floor height is very low, even less than 2.5 meters, then it is not suitable to integrate the ceiling in a large area, but the ceiling can be integrated in a small area, such as hanging a circle of more than ten centimeters wide and 10-18 cm high. There is a light that illuminates upwards, while the middle part remains at the original height. It can be brushed with a light blue paint, which makes the top surface appear as high as the sky and enrich the top level. The same effect can be achieved by partially integrating the ceiling in a concealed part of the room. For high-rise rooms, you can freely choose the integrated ceiling and shape, which can be curved, round, square, shaped top, or can be divided into two or even multiple levels of integrated ceiling shape, and can be integrated with large area ceiling To reduce the height of the floor.

Jazz Series

Jazzy Bathtub,Jazzy Luxury Bathtub,Jazzy Massage Bathtub,Freestanding Jazzy Bathtub

Foshan Guanyu Group , http://www.guanyu-group.com

Posted on