Precautions for acceptance of water and electricity during home improvement

It depends on the safety of the water circuit reform, whether the wire joints are firm, whether they are exposed, whether the switch is in a state of ignition, and whether the water pipe anchors are firm.

1. It depends on the rationality and whether there is an unreasonable situation surrounding it;

2, depending on the functionality, whether the lamp switch is smart and effective, whether the socket has electricity, whether it meets the requirements of left-right-zero-fire, on-line grounding. Is the telephone line, broadband network, and TV coaxial cable unobstructed?

3, depends on the aesthetics, whether the installation is smooth, the same room is at the same level.

Five steps for home decoration acceptance

Consumers usually monitor their construction quality by taking a personal eye on the site so that problems can be solved in time. In fact, if it is an outsider in the decoration, even if it is soaked in the construction site every day, problems cannot be seen. For those who suffer from lack of time, "staring at the site" is even more unrealistic. Therefore, if consumers can grasp the progress during the renovation process and carry out inspections in stages, they can avoid the pain of going around and control the quality of construction.

1, before entering the market

Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement.

2, water circuit

The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the line transformation under the operation of a professional hydraulic or electrician. Actual size. Only after the line is changed, the putty worker can continue to seal the wall and putty.

3, carpentry work size

The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the parts, such as found inconsistent place, promptly prompt the construction team to modify.

4, woodworking work quality

When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.

After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.

5, after completion

The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, consumers should require the construction team to clean the room thoroughly before moving back.

In the home decoration, electric construction does not seem to be a lot on the surface, but many potential problems leave many hidden dangers for future life. The common problems are: short circuit of the distribution line, weak television signal, and interference from telephone reception.

problem:

1. The main reason is that there are too many line connectors and improper handling of connectors. Some lines are too long. Some joints will be produced during the electrician's operation. However, due to technical limitations of some electricians, the wiring, insulation, and moisture-proof treatment of joints are not good, and disconnection, short circuit, etc. will occur.

2. To reduce the cost of cutting corners, the wiring for the concealed treatment is not sleeved.

3. The completed line was damaged by subsequent construction. If the wall line is interrupted by an electric hammer and the floor is paved, the air nail gun penetrates the PVC pipe or sheath wire.

4. The distribution line does not take into account the different rated currents of the wires of different specifications. The "small horse-drawn cart" causes the line itself to be overloaded for a long time.

5. Different lines go the same line. If the television antenna, the telephone line and the distribution line are threaded into the same casing, the reception of the television and the telephone is disturbed.

Plumbing series

After you move into your new home, you may find water-related quality problems. Such as leaking water pipes, odors in wash basins and vegetable sinks, small bathtub showers, and inconvenience in the use of sanitary ware.

problem:

1. Pipe Leakage: Assuming there are no quality problems with pipes and fittings, both cold and hot water pipes may leak. Cold water pipe leakage is generally sealed when the water pipe and fittings are not connected; hot water pipe leakage is not done in addition to the seal, but also may be improper sealing material selection.

2. The reason for the small water flow: In the construction of plumbing, in order to connect the entire line, it is necessary to put thread on the sawed water pipe. If the thread length is too long, when the pipe is screwed into the pipe fitting (such as the elbow), it will be too deep. As a result, the cross section of the water flow becomes smaller and the water flow is smaller.

3. The hose bursts. The serpentine hoses are mostly used to connect pipes from plumbing to sanitary fixtures. If the hose is of poor quality or the hose is tightened when the plumber installs it, the hose will burst when it is not used for a long time.

4. The reason for overflowing the toilet when flushing is that when the toilet is installed, the groove of the base is not sealed with an oil filler, and flushing will overflow the sewage from the gap between the base and the ground.

5. Wash the water back to the odor. In the renovated bathroom, the position of the wash basin often shifts to the wrong place with the water entrance, and it is often difficult to directly use the wash pipe when the wash basin is bought. The installation workers are trying to save time and do not generally do S-bends, resulting in the direct passage of the washbasin and the sewer, and the odor returns from the sewer.

After the housing decoration is completed, it is indispensable for acceptance. The owner accepted the project, and the standard was the decoration contract, the construction drawing signed by the owner, and relevant documents of the relevant state department on the quality inspection of the decoration project. The acceptance was mainly carried out in the following aspects:

Furniture: The lines are smooth, the sealing line, the corner line and the panel interface are dense and smooth, the sliding of the door cabinet drawer is smooth, and the handle is symmetrical and beautiful.

Power lines: The circuit shall be laid in accordance with construction regulations and safety standards. The socket shall not be less than 30 cm from the ground. The three-wire socket shall be grounded. The kitchen and air-conditioning lines shall be laid in dedicated lines. The main gate shall be equipped with a leakage prevention switch and the lamps shall be firmly installed.

Doors and Windows: The switch is easy, and the door frame, window frame and glass are well sealed.

Ground: The floor tiles are flat, clear in texture, uniform in color, horizontal and vertical in the cross line, the floor is paved with smoothness, the joints are straight, and the paint has uniform color and no scratches.

Wall: The wallpaper has firm paste, tight joints, complete pattern, consistent pattern, clean edges and no burrs, and the coating is even and smooth, without any bumps, no color, and no dust.

Water supply and drainage facilities: The water supply pipe has no leakage, the on-off valve operates well, and the drainage is smooth without leakage or water accumulation.

Paint: smooth paint, good feel, enough oil, no nails, scratches, burrs and color.

In short, the acceptance of new houses should be carefully and it is better to open all light sources first to avoid unnecessary troubles in the future. The wire concealment project must adhere to the acceptance signature expert's introduction. In order to change the wire concealment project in the home renovation, the casing must be used. The wires used must meet the national standards of the regular manufacturers. The casing engineering of wires and wires must be checked and accepted with acceptance signature. Every link in the middle cannot be omitted. Electricity is a very important part of the home improvement process. It involves the safety of life and property and must not be neglected.

Beijing family room decoration decoration project acceptance criteria, electrical products, materials must be in line with the current technical standards of qualified products, wires, cables, switches, sockets should also have a national electrical product safety certification; electrical wiring should adopt dark pipe laying, The conductor shall not have knots and kinks in the tube. The distance from the telephone line to the closed-circuit television line shall not be less than 50 centimeters. There shall be no exposed conductor in the ceiling. It is forbidden to directly bury the conductor in the plastering layer; Correctly, the dampproof switch and safety socket shall be selected in the toilet and bath room. The grounding wire with grounding hole socket shall be laid separately. The grounding wire shall not be mixed with the working zero line. The earthing protection shall be reliable, and the insulation resistance between the conductors and between the conductor and the ground shall not be lower than 0.5M. When facing the power outlet, it should meet the requirements of the left and right phase, grounding; the switch, socket is firmly installed, the position is correct, the cover is positive, the surface is clean, close to the wall, there is no gap, the height of the same room switch or socket Consistent; after the completion of the electrical engineering construction, necessary inspections and tests shall be carried out, such as the action of the leakage switch, the insulation resistance of each circuit and the power supply of the electrical appliances, the lighting test of the lamps, the switch test control, etc., and they can be used only after passing the inspection; Provide the user with a schematic diagram of the electric installation, indicating the wire size and the direction of the dark pipe.

Entrance Decoration Children's Room Decoration Switch Socket TV Decoration Paint Home Decor Glass Brick Chests Drawers Glass Furniture Kitchen Doors Floor Tiles Glass Doors Kitchen Glass Sliding Doors Bathroom Doors Bathroom Ceiling Material Bathroom Door Size Bathroom Size Bathroom Ceiling Bathroom Floor Tile Bathroom Leakage

 Aluminium Wardrobe Door Profile

In modern home decoration, the wardrobe door is essential. The aluminum alloy wardrobe door has the advantages of numerous color styles and can be highly unified with the indoor home style. There are two types of closet doors, swings/flat-type wardeobe doors and sliding/push-pull wardrobe doors. The sliding/push-pull closet door is light, easy to use, high in space utilization, and the customization process is relatively simple. Swing-type closet door, elegant, atmospheric, suitable for large indoor use



Material Grade: Aluminum Alloy 6000 series:6063,6061,6060,6005
Temper: T3-T8
Finish: Anodised, powder coated, sandblasting, electrophoresis ,titanium Powder coating, Polish, Brushed, PVDF coating, wood-grained etc.
Color: Silvery white, black, golden, champagne, dark bronze or according to your requirement
Shape: Square, Round, Flat, according to  customers' drawings
Thickness: Above 0.7mm,the thicker the better

Specification:
A.    Length: ≤6.5m
B.  Normal Wall thickness: ≥1.0mm
C.  Normal Anodizing thickness: ≥8µm
D.   Normal powder coating thickness: 60-120µm
E.  Tensile strength: ≥160mpa
F.  Yield strength: ≥110mpa
G.    Extensibility: ≥8%
H.    Hardness(HW): 8-15
Packing details: Kraft paper, EPE Fram, Shrink film, Composite paper or as your need
MOQ: 500kg
Delivery time: Normally20-25days for a 40ft container after we confirm your deposit.
Normal order sequence:
1. Confirm the drawings, colors and price
2. Pay the mould fee and we start to make moulds
3. We send samples to you for your confirmation
4. Make the payment of 30% deposit, start production
5. Delivery 

Aluminium Profile wardrobe door



Aluminum Wardrobe Door Profile

Aluminum Wardrobe Door Profile,Sliding Wardrobe Doors,Aluminium Wardrobe Designs,Aluminum Wardrobe

Zeyi Aluminum Co., Ltd. , http://www.zeyialuminum.com

Posted on