Indoor and outdoor hydropower renovation decoration knowledge Daquan

We must have our own thinking when we carry out indoor hydropower reforms. After all, the houses are used by ourselves and the hydropower reform needs precise planning and layout so as to avoid renovation accidents. Therefore, in the process of reconstruction, we must be able to facilitate our own lives under the premise of ensuring safety. Mainly. Next, take a look at indoor and outdoor hydropower renovation decoration knowledge along with Xiao Bian!

Indoor and outdoor hydropower renovation decoration knowledge

I. Details of hydropower reform

1, waterway design First of all want to have a good water-related equipment, such as: water purifiers, water heaters, kitchen Po, toilets and wash basins, their location, installation methods and whether the need for hot water; to think ahead of the use of gas Or electric water heaters, to avoid the temporary replacement of water heaters, leading to repeated changes in the waterway; toilets in addition to leaving wash basins, toilets, washing machines and other outlets, it is best to take one out, and then pick up the water and other very convenient;

2, when the cabinet manufacturers come to the door for the first time, it is best to bring the construction masters of the water together and communicate in person. Before the construction, waterproof should be done upstairs to ensure that no water can seep downstairs before construction.

3. After the completion of the waterway reform, a pressure test is required. The pyrotechnician reminds you to use a pressure machine to reach 6 to 8 atmospheres for 30 minutes without leakage. The pressure test is best to have the property present, which can play a supervisory role; because some decoration teams will deceive the owners in this section.

4, after the completion of the kitchen floor tiles should be checked to see if the drainage of the floor drain is smooth (in order to remove the drainage rate after the cover drain, which is due to the slow drainage of the majority of deep water seal leaks); if you want to close the excess floor drain The gap between the drain pipe and the floor drain must be blocked to prevent the overflow of the water.

5, washing machine floor drain is best not to use deep water sealing floor drain, because a deep water seal leakage has a common feature is the slow water, used in showers and other locations of deep water sealing leakage, due to the small amount of water, floor drain can basically meet the needs of drainage; However, the speed of the drainage of the washing machine is very fast, and the displacement is large. The rate of water entering the deep water seal leakage cannot be satisfied at all, and the result will directly lead to the overflow of the water.

Second, the indoor and outdoor waterway transformation

1, our bathroom often will be our entire indoor water use more places, so we have to consider in addition to setting the main outlet outside the room, such as wash basins, toilets, washing machines, etc. Set up a separate outlet, which will be more conducive to our daily mopping.

2, in the inspection of the house must pay attention to the inspection of our indoor kitchen, bathroom, each drainage outlet is smooth, because after the pasting tiles may cause our drainage port blocked, it must be tested to ensure that the drainage smooth.

3. When we carry out hydropower reform, we must also consider all indoor water-related equipment, such as water purifiers, water heaters, sub-tap, so we need to set aside cold and hot water supply pipes. This will also be beneficial to us. life. However, in the specific installation, it is necessary to pay attention to the fact that the heights of the hot and cold water nozzles should be the same, the water pipes should be perpendicular to the wall, and our cold and hot water nozzles should be about two more than our wall. In centimeters, we must also ensure that our interior wall tiles and plumbing nozzles are at the same level.

4, indoor waterproof to be in place. Indoor waterproofing is directly related to our living conditions. Especially for our bathroom, the waterproofing of the wall should be at least 180cm high. This will not cause sweating in the wall due to excessive water use.

Second, the transformation of indoor and outdoor circuits

1. The design of our indoor circuits must consider its feasibility and practicality. At the same time, it must not be rigid and the interior design should be more flexible. Therefore, we must clearly design ideas and their own ideas with the workers before the specific construction, so that it will not cause too many flaws.

2, we can consider the use of dual-control switch when the bedroom ceiling light design switch, that is, set a switch at the door and headboard, which will be more convenient for our lives.

3. Generally speaking, for the convenience of use and safety, the distance between our indoor socket and the ground should not be less than 20cm. Generally, 30 is the best. The distance of our switch from the ground should be 130cm. At the same time, sockets should be provided in our corridors and balconies.

4. In the concrete construction, pvc pipe must be used to bury the line pipe, and there can only be 3 lines in a pipe. At the same time, the panel should be reserved at the joint, which is also more conducive to inspection.

The above is the introduction of the relevant content of indoor and outdoor hydropower renovation and decoration, and I hope to help you. For more information on hydropower reform, please continue to pay attention to the information on this site.

Hydropower renovation home improvement hydropower renovation decoration materials knowledge decoration Daquan family decoration renderings

Oleic Acid Amide

Antistatic Agent,Oleic Acid Amide,Oleamide Lubricant Agent,Cas 301-02-0

Jiangxi Zhilian Plastics & Chemicals Technology Co., Ltd , https://www.zhilian163.com

Posted on