Aluminum ceiling installation process

【China Aluminum Industry Network】 1. Construction process line, installation of boom, installation of main keel, installation of auxiliary keel, arching and leveling, installation of aluminum ceiling.

2. Construction method (1) According to the drawing, first pop up the horizontal ink line of the ceiling elevation on the wall and column, draw the ceiling layout on the top plate, determine the position of the suspender and weld with the original reserved suspension bar, if the original position of the reinforcement bar is not consistent or When there is no reserved ribs, M8 expansion bolts are used to fix on the top plate, and booms are machined with φ8 steel bars.

(2) Install the big keel according to the ceiling elevation, adjust the hanging after the basic positioning and leveling the lower skin (note the amount of lifting); then determine the position of the middle and small keels according to the specifications of the board, the middle and small keels must be tightly attached to the bottom surface of the big keel , Apply vertical clamps when installing the vertical clamp to prevent tightness.

(3) The main keel spacing is generally 1000mm, keel joints should be staggered; the direction of the boom must be staggered to avoid tilting the main keel to one side. Adjust up and down with the bolts on the suspenders to ensure a certain degree of arching, depending on the size of the room arching 5-20mm, the room is short to 1/200, and then tighten the nuts one by one after adjusting the levelness, the position of the opening needs to be big keel Reinforcement.

(4) During the construction process, attention should be paid to the cooperation among the various types of work. After the construction of the tuyere, lighting fixtures, fire-fighting pipelines, etc. in the ceiling is completed, the panel can be installed after various tests.

(5) Aluminium plate installation: Note that the surface color of aluminum plate must meet the requirements of the design specifications, the geometric dimensions of the aluminum plate should be checked, the deviation should be ±1mm, attention should be paid to the size of the joint when installing, and the surface protective film should be torn off after installation.

Features:
1. It is very easy to install Ramming Pole Mounting System. You should insert vertical pillar into ground by Pile Driver. (The depth can reach 1500-2000mm).
2. High adaptability
The ramming pole mounting system can be widely used different geological conditions. Besides, the installation is free from seasonal change.
3. Environmental-friendliness 
There is no much preparation for installation and piles can be recycled. It had no damage and no corrosion to environment.
4. Ramming pole can be easily installed and removed.
5. The ramming pole mounting system areas with low rock content to reduce cost on base construction and to shorten installation time.

Single Ramming Pole Mounting System

Solar Panel Pole Mount,Solar Panel Mounting Brackets,Ground Mounting System,Solar Panel Stand,Single Ramming Pole Mounting System

Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com