Xindaxin Materials will speed up the construction of the resin diamond line project

Abstract On April 29th, Zuo Tao, the president of Xinda New Materials, went to Yicheng Company to conduct research and research. The middle management of the company participated in the research meeting. Vice President of Xinda New Materials and Party Secretary of Yicheng Company, Zhi Zhiyong presided over the meeting, and General Manager Liang Xizheng Reported on the recent work of Yicheng Company. ...
On April 29th, Zuo Tao, the president of Xinda New Materials, went to Yicheng Company to conduct research and research. The middle management of the company participated in the research meeting. The vice president of Xinda New Materials and the party secretary of Yicheng Company, Zhi Zhiyong presided over the meeting, and the general manager Liang Xizheng Yi Cheng's recent work has been reported.

After listening to the report of Yi Cheng's work, President Zuo Tao gave a briefing on the production and operation of Xindaxin Materials in the first quarter, and affirmed the achievements in the first quarter, and the company in the second quarter or even the third quarter of the new big new materials. The business strategy and layout were elaborated, and specific requirements were put forward for the overall work. In particular, it has set clear time requirements for the construction of the resin diamond wire project and the waste silicon material preparation metal silicon project. In the end, President Zuo Tao hopes that the majority of cadres and employees should be closely united around the company's management team, seize the current favorable opportunity, and concentrate on contributing to the healthy and sustainable development of the company.

This indicates that the new Daxin resin Resin Diamond Line project and the waste silicon material preparation metal silicon project construction have established a clear schedule, and the project construction will accelerate.

Carbon steel threaded flanges that are made to standards called out by ASME B16.5 or ASME B16.47, and MSS SP-44. Forged Threaded Flange is typically made from forged materials and has machined surfaces. ASME B16.5 refers to nominal pipe sizes (NPS) from ½" to 24". B16.47 covers NPSs from 26" to 60". Each specification further delineates flanges into pressure classes: 150, 300, 400, 600, 900, 1500 and 2500 for B16.5, and B16.47 delineates its flanges into pressure classes 75, 150, 300, 400, 600, 900.

Forged steel flange

Product Range:

1.Welding neck Flange    2.Slip on

3.Blind Flange                4.Long welding neck flange   

5.Lap joint flange           6.Socket welding

7.Threaded Flange          8.Flat flange

Size:

DN15-DN2000

Pressure:   

150#, 300#, 600#,900#,1500#, 2500#

PN6, PN10, PN16, PN25, PN40, PN64, PN100

PN6, PN10, PN16, PN25, PN40

1K, 2K, 5K, 10K, 16K, 20K, 30K, 40K

Standard:   

ASME B16.5, ASME B16.47A, ASME B16.47B

BS4504

DIN2631, 2632,2633,2634,2635; DIN2573,2576,2502,2503, 2543,2545;DIN 2527;DIN2565,2566,2567, 2567

GOST12821-80;GOST12820-80

EN1092-1

JIS B2220

Material:  

ASTM A105.  CS/SA 105/SA105N; CS RST37.2, S235JR; Q235; CS CT20; CS SS400, SF440; S235JRG2,P245GH,P250GH, P280GHM 16MN, 20MN ,20#

Coating:  

Black, Yellow paint; rust-proof oil;  Antirust oil, Clear lacquer, Black lacquer, Yellow lacquer, Hot-dipped Galvanized, Electrical galvanized

Package:  

Ply-Wooden Case for small size

Pallet for big size

Certificate:

TUV,ISO9001:2008;PED97/23/EC,ISO14001:2004,

OHSAS18001:2007

The Third Part Inspection:

BV,SGS,LOIYD,TUV,and other party alloyed by clients

Heat Treatment:

Normalizing, Annealing, Quenching+Tempering

Technical:

forging

Brand

CHM

Min Order:

1PCS

Payment Terms:

T/T, 100% LC AT SIGHT,  100% LC 30 OR 60DAYS AFTER BL OF DATE,

Delivery Time:

7-30days according to acutal order.

Delivery Port:

TIANJIN, QINGDAO,SHANGHAI, NINGBO, SHENZHEN,

Delivery Ability:

500TONS/MONTH

Applicating:

Paper-marking, Oil and natural gas pipeline, Boiler and heat exchanger, Smelting, Water conservancy, Electric power, Chemical,

Pharmaceuticals etc

Pipe FlangeCarbon Steel FlangeForged FlangePipe Fitting FlangeWelding Neck FlangeWeld Neck FlangeBlind FlangeFlange TestingFlange Packing

Threaded Flange

Carbon Steel Threaded Flange, Forged Threaded Flange, ANSI B16.5 Threaded Flange, DIN Threaded Flange, JIS Threaded Flange, EN 1092-1 Threaed Flange

HEBEI HANMAC MACHINE CO., LTD. , https://www.chinahanmac.com

Posted on